View of Progression of Dam Site
Original caption: Above is a view, taken from the foundation of the power house, of construction at Norris Dam, which was being built by the TVA on the Clinch River in Northeastern Tennessee, and shows the downstream ends of the two Penstock tubes that carry the water to the turbines. These great pipes were 20 feet in diameter.